- June 18, 2019
The existing footpath on this industrial site in Leatherhead required re-surfacing.
With the footpath receiving heavy footfall on a daily basis, we worked closely with the client to provide a temporary footway whilst the works were carried out. Pre works meetings on-site were held with the client to ensure delivery was safe and to schedule.
Client: | Corporate Client in Leatherhead |
---|