- June 28, 2019
During the winter months the bridleways had fallen into bad repair and were deeply rutted due to farm vehicle use and it was hard for equestrian and pedestrians to use the paths.
We were tasked to excavate and level the existing paths before we applying two 50mm layers of Type 1 MOT and machine compacted to bring the paths back flat and level for the public to use. In 2019 we made good several thousand m2 of Bridle ways for the Parks department.