- June 18, 2019
These works in the London Borough of Sutton were part of a regeneration scheme.
We excavated the existing asphalt footway and supplied/laid block paving. During these works, we endeavoured to keep the footway open as much as possible outside of our working hours but ensured safe diversionary routes were implemented when this wasn’t practicable.
Client: | London Borough of Sutton |
---|